ASME RA-S : 2008
ASME RA-S : 2008
LEVEL 1/LARGE EARLY RELEASE FREQUENCY PROBABILISTIC RISK ASSESSMENT FOR NUCLEAR POWER PLANT APPLICATIONS
American Society of Mechanical Engineers
LEVEL 1/LARGE EARLY RELEASE FREQUENCY PROBABILISTIC RISK ASSESSMENT FOR NUCLEAR POWER PLANT APPLICATIONS
American Society of Mechanical Engineers
Foreword
Preparation of Technical Inquires to the Committee
on Nuclear Risk Management
Committee Roster
Preface
PART 1 - GENERAL REQUIREMENTS FOR A
LEVEL 1 PRA, INCLUDING LARGE
EARLY RELEASE FREQUENCY
PART 2 - REQUIREMENTS FOR INTERNAL-EVENTS
AT-POWER PRA
PART 3 - REQUIREMENTS FOR INTERNAL FLOOD
AT-POWER PRA
PART 4 - REQUIREMENTS FOR INTERNAL FIRES
AT-POWER PRA
PART 5 - REQUIREMENTS FOR SEISMIC EVENTS
AT-POWER PRA
PART 6 - REQUIREMENTS FOR SCREENING AND
CONSERVATIVE ANALYSIS OF
OTHER HAZARDS AT-POWER
PART 7 - REQUIREMENTS FOR HIGH-WIND
EVENTSAT-POWER PRA
PART 8 - REQUIREMENTS FOR EXTERNAL FLOOD
EVENTS AT-POWER PRA
PART 9 - REQUIREMENTS FOR OTHER HAZARDS
AT-POWER PRA
PART 10 - SEISMIC MARGIN ASSESSMENT
REQUIREMENTS AT-POWER
Specifies requirements for probabilistic risk assessments (PRAs) used to support risk-informed decisions for commercial nuclear power plants, and describes a method for applying these requirements for specific applications.
| Document Type | Standard |
| Status | Current |
| Publisher | American Society of Mechanical Engineers |
| Supersedes |
|